Poultry Welfare – Compliance Checklist
|
S. No. |
Compliance Requirement |
Applicability / Responsibility |
Records / Evidence |
|
1 |
A documented poultry welfare programme shall be established covering poultry catching, transportation, holding, stunning and slaughter/processing. |
Poultry suppliers and processors |
Poultry Welfare Programme / SOP |
|
2 |
The welfare programme shall incorporate relevant elements of the welfare audit into the processing unit's quality plans and manuals. |
Processing Unit |
Quality Manual / Welfare Audit Checklist |
|
3 |
Poultry intended for slaughter shall be clean and in good health at the time of catching. |
Poultry Supplier / Catcher |
Supplier records / Pre-slaughter inspection records |
|
4 |
Reasonable precautions shall be taken during catching to minimise injury to poultry. |
Poultry Catcher / Supplier |
Catching SOP / Welfare inspection records |
|
5 |
Persons engaged in catching poultry shall be appropriately trained in humane handling and injury prevention. |
Poultry Supplier / Catching Contractor |
Training records / Attendance sheets |
|
6 |
Transport crates/cages shall be maintained in good repair and suitable condition. |
Poultry Supplier / Transporter |
Crate inspection / Maintenance records |
|
7 |
Crates/cages shall be free from damage that could cause injury to poultry or result in accidental opening during transportation. |
Transporter |
Pre-loading crate inspection checklist |
|
8 |
Transport crates shall not be over-filled. |
Transporter / Catching Team |
Loading records / Welfare inspection |
|
9 |
Adequate space shall be provided in crates to enable all poultry to lie down during transportation. |
Transporter |
Loading-density records / Transport SOP |
|
10 |
Poultry held in storage/holding sheds shall be provided with adequate ventilation. |
Processing Unit |
Holding-area inspection records |
|
11 |
Appropriate climate-control arrangements, such as fans or curtains, shall be provided in holding areas as required to protect poultry welfare. |
Processing Unit |
Equipment maintenance records / Shed inspection checklist |
|
12 |
Stunning equipment shall be properly maintained and kept in working condition. |
Processing Unit |
Equipment maintenance / Calibration records |
|
13 |
The effectiveness of stunning shall be checked to confirm that poultry are insensible prior to slaughter. |
Processing Unit / Slaughter Personnel |
Stunning monitoring records |
|
14 |
The interval between stunning and slaughter shall be controlled and kept sufficiently short to minimise the possibility of poultry regaining consciousness before slaughter. |
Processing Unit |
Stunning-to-slaughter monitoring records |
|
15 |
The welfare programme shall cover the poultry welfare requirements throughout the relevant stages of catching, transport, holding, stunning and processing. |
Poultry Supplier and Processing Unit |
Approved Welfare Programme / Internal Audit Reports |
Author Bio
Shweta Verma
CS Trainee View Full Profile


Be the first to leave a comment for this Article